Real Factory.
Real Builders.
Real Experience.
Not a reseller.
Not a broker.
A true American tiny home manufacturer.
Engineered cold-formed steel framing packages for owner-builders planning a backyard accessory dwelling unit.
A DIY ADU kit provides a coordinated structural starting point. It is not a completed dwelling, a universal permit package, or a substitute for property-specific approvals and site work.
The property, intended use, dimensions, foundation, openings, roof form, design loads and local approval path shape the kit.
Precision-manufactured cold-formed steel members are prepared from approved project information for organized assembly.
Your written proposal identifies the structural components, documentation, services and optional work included in the package.
The owner coordinates assembly, enclosure, utilities, finishes, local trades, inspections and site responsibilities unless the proposal says otherwise.
Confirm zoning, setbacks, utilities, access, foundation requirements, permits and inspections with the applicable local authorities.
Our team coordinates engineered foundation and steel-framing systems from our manufacturing facility in Olathe, Colorado.
Every ADU project depends on the property, local rules, approved plans and the exact package scope.
The exact scope is defined in the project proposal. A package can include engineered cold-formed steel framing, labeled members, supporting documentation, foundation coordination and delivery planning. Site work, utilities, finishes and local services are not assumed unless specifically listed.
No. A structural kit is an owner-builder starting point rather than a completed dwelling. Customers wanting more factory-completed work should compare shell, semi-complete and turnkey ADU options.
Not automatically. Zoning, setbacks, height, lot coverage, utilities, foundation requirements, energy rules, fire access, permits and inspections vary by jurisdiction. Confirm the property and approval path before manufacturing.
Provide the project city and state, intended use, approximate dimensions, preliminary floor plan, foundation concept, desired package level, target schedule and delivery needs. Site and approval details help the team identify unresolved requirements.
For a DIY kit, the owner coordinates assembly and the remaining construction, either personally or through qualified local contractors. The proposal should identify responsibilities for enclosure, mechanical systems, utilities, finishes, inspections and installation.
A DIY kit leaves substantial construction and coordination to the owner and local trades. A factory-built modular ADU completes much more work before delivery and follows a different approval, transportation and installation path.
Share your property, design, package and delivery requirements for a project-specific review.
trailermadetrailers.net is not affiliated with Trailer Made and that customers should only communicate through thetinyhouseexperts.com and our confirmed company contact information.